Germany · Schwarzwaldbahn

Black Forest Railway

Offenburg Konstanz

Robert Gerwig's 1873 mountain line through the Black Forest, filmed from the cab from Offenburg over the Triberg loops and down to Konstanz on Lake Constance.

Best season
May–October for green valleys, December–March for snow on the high section

Filmed by Tf - suedbaden · Offenburg → Konstanz

Watch on YouTube

OffenburgHausachHornbergTribergSt. GeorgenDonaueschingenSingen (Hohentwiel)Konstanz

The route

The Black Forest Railway runs 149 km from Offenburg in the Rhine valley to Singen am Hohentwiel, crossing the southern Black Forest. It follows the Kinzig valley to Hausach, climbs through the Gutach valley past Hornberg and Triberg to St. Georgen, then runs down past Villingen and Donaueschingen to Singen. Regional trains continue on the older line from Singen to Konstanz, so the filmed journey ends on Lake Constance.

The line was built between 1863 and 1873 to plans by the Baden engineer Robert Gerwig. Between Hausach and St. Georgen the railway has to gain 564 m over a straight-line distance of only 21 km, so Gerwig lengthened the route to 38 km with two double loops near Triberg, keeping the gradient under 20 per mille. Of the line's 39 tunnels, 37 lie on this one section.

The whole line was completed on 10 November 1873. Double track was finished by 1921 and electrification on 25 September 1977, and trains today run at up to 140 km/h. Since December 2006 the regional express trains between Karlsruhe and Konstanz have been run by DB Regio with class 146 electric locomotives and double-deck coaches, the train type the video's description also names. Local S-Bahn and a few long-distance trains share the line.

What to watch for

  1. The Hornberg viaduct

    Shortly after Hornberg the train crosses the Reichenbach valley. This is the only large viaduct on the line. The original structure was replaced by the present arched bridge, built from 1924 and opened at the end of October 1925; a pillar was damaged on 22 April 1945, and trains were running again by 30 June.

  2. Loops in the Gutach valley

    Watch the valley floor around Triberg. To keep the grade below 20 per mille, Gerwig laid out two double loops, so the track climbs along one side of the valley, swings round and comes back along it at a higher level. The Black Forest Railway was among the first mountain railways to gain height this way.

  3. Under the watershed

    Between Triberg and St. Georgen the train enters the Sommerau tunnel, 1,697 m long. It passes under the main European watershed: streams on one side flow to the Rhine and the North Sea, on the other to the Danube and the Black Sea. Further on, the 900 m Hattinger tunnel crosses the watershed a second time.

  4. Along the young Danube

    After Donaueschingen the Höllental Railway from Freiburg joins, and the track follows the Danube, formed here by the Brigach and the Breg, towards Immendingen. The river beside the train is still small, a modest stream at the start of a journey that ends in the Black Sea.

What you will see

The film starts at Offenburg and runs up the Kinzig valley to Hausach. Here the hills close in. Past Hornberg the train crosses the Reichenbach valley on the line's one large viaduct and begins the steep climb.

Between Hornberg and St. Georgen the screen goes dark again and again as the train passes through short tunnels, coming out each time a little higher on the valley side. Around Triberg the track doubles back on itself in the loops, so the same valley appears from different heights. The long Sommerau tunnel ends the climb.

From St. Georgen the line runs gently downhill beside the Brigach to Villingen and Donaueschingen, where the Danube begins. The forest gives way to open country, and after Singen the last stretch leads to Konstanz and the shore of Lake Constance.

Station by station

  1. OffenburgThe start of the line, on the main Rhine valley route north of Freiburg. From here the Black Forest Railway turns east and follows the Kinzig river into the hills.
  2. HausachWhere the gentle Kinzig valley section ends and the mountain climb begins. Hausach also holds a 1,600 m HO-scale model of part of the line, one of Europe's largest models of a real railway.
  3. HornbergA small town where the line crosses the Reichenbach valley on its only large viaduct. The arched bridge seen today replaced the original in 1925 and was repaired after damage in April 1945.
  4. TribergThe heart of the climb, where the track winds around double loops in the Gutach valley to gain height. An old steam locomotive stands at the station, the start of a railway trail with 16 stops.
  5. St. GeorgenThe top of the steep section, reached after the Sommerau tunnel takes the line under the main European watershed. From here the track runs beside the young Brigach river.
  6. DonaueschingenThe town where the Brigach and Breg join to form the Danube. The Höllental Railway from Freiburg meets the line here, and the track then follows the Danube towards Immendingen.
  7. Singen (Hohentwiel)The end of Gerwig's mountain line and a junction with the High Rhine Railway. Lake Constance, the destination the line was built to reach, is now only a short run away.
  8. KonstanzThe lakeside city where the filmed journey ends, reached on the Singen–Konstanz line opened in 1863. Regional trains run on across the Swiss border to Kreuzlingen.

Riding it for real

DB Regio's regional express trains with double-deck coaches run between Karlsruhe, Offenburg and Konstanz along the whole line, and some long-distance trains also use it. The Ortenau S-Bahn serves the lower Kinzig valley around Offenburg and Hausach. Check Deutsche Bahn or the regional operator for current timetables and fares before you travel.

The video is embedded from YouTube and remains on its owner’s channel. Views count toward the original video.

Sources