France · Ligne des Cévennes (Le Cévenol)
Cévennes Line
Nîmes Clermont-Ferrand
A cab ride over the whole Cévennes line, 303 km from Nîmes to Clermont-Ferrand, climbing to about 1,025 m and following the Allier gorges over stone viaducts.
- Length
- 303 km
- Journey time
- More than 4½ hours for the full filmed run
- Best season
- Late spring and early autumn, when the Cévennes valleys and the Allier gorges are green or turning
Filmed by Railtrotter · Nîmes → Clermont-Ferrand
The route
The Ligne des Cévennes runs 303 km between Nîmes on the Mediterranean plain and Clermont-Ferrand in Auvergne, crossing the departments of Gard, Lozère, Haute-Loire and Puy-de-Dôme. It climbs over the southern edge of the Massif Central and reaches its summit, about 1,025 m, near La Bastide-Saint-Laurent-les-Bains, before following the Allier river north through its gorges. In one journey it links the Mediterranean south with the uplands of central France.
It began as a coal railway. Paulin Talabot's company, founded in 1836 to serve the Alès coal basin, opened the line from Nîmes to Alès in 1840 and on to La Levade in 1841. The PLM company took it over in 1855, and the mountain sections were added piece by piece until Langeac–Villefort opened on 16 May 1870, completing the route.
The terrain made it one of the hardest lines in France to build. The filmmaker counts 107 tunnels and 71 bridges and viaducts on the way, many of them curved stone viaducts such as Chamborigaud and Chapeauroux, both listed historic monuments. Between Alès and Arvant it is still single track. Freight has almost gone, but the line keeps the rural Cévennes and upper Allier connected.
What to watch for
Ners and the first coal line
Between Saint-Geniès and Alès the train runs over the oldest part of the route, opened in 1840 by Paulin Talabot's coal company. The station at Ners on this stretch was built in an English style as a tribute to George and Robert Stephenson, a reminder of how much early French railways borrowed from British engineering.
Curving over Chamborigaud
In the chapter from La Grand-Combe-La Pise to Génolhac, watch for the train leaning into a long curve high above the Luech valley. The Chamborigaud viaduct has 41 arches, stands 46 m above the valley and is laid on a curve of 200 m radius. It has been a listed historic monument since 1984.
Over the top at La Bastide
About 1 hour 48 minutes in, the train reaches La Bastide-Saint-Laurent-les-Bains, the highest point of the line. The section climbing here from La Levade, and the branch to Mende that leaves at this station, were designed by the engineer Charles Dombre. The video's own title puts the climb from the plain at 43 m to 1,023 m above sea level.
Chapeauroux, the New World viaduct
Just after the 2 hours 6 minutes chapter mark, the train crosses the Chapeauroux viaduct: 433 m long, 28 arches of 12 m, curving on a 260 m radius. Work began around 1857 under the Grand Central company, which went bankrupt; the PLM resumed it in 1862. It is also called the viaduc du Nouveau Monde, after the workers' camp beside it.
What you will see
The video, filmed from the cab of a Coradia Liner B84500 unit, starts at Nîmes and runs north across the garrigue to Saint-Geniès-de-Malgoirès and Alès. After La Grand-Combe-La Pise the railway enters the Cévennes proper, climbing along wooded valley sides, in and out of tunnels, to Chamborigaud and Génolhac.
From Génolhac the line keeps climbing past Villefort, with long views down into the valleys, and reaches La Bastide-Saint-Laurent-les-Bains at the summit a little under two hours into the film. Beyond it the landscape changes to open upland around Luc and Langogne.
After Langogne the train descends into the Allier gorges, crossing and recrossing the river past Chapeauroux, Alleyras and Monistrol-d'Allier. At Langeac the valley widens, and the last part of the film runs through farmland past Brioude and Issoire to Clermont-Ferrand.
Station by station
- NîmesSouthern end of the line and the start of the video. The first stretch north to Alès opened on 10 August 1840, built to carry coal from the Cévennes mines down to the plain.
- AlèsOld capital of the Cévennes coal basin that the line was first built to serve. From here northwards to Arvant the line is single track, and a branch still runs to Bessèges.
- GénolhacVillage station on the slopes of Mont Lozère, reached after the climb out of La Grand-Combe and over the curved Chamborigaud viaduct. The Villefort–La Levade section through here opened in 1867.
- La Bastide-Saint-Laurent-les-BainsSummit of the line, at about 1,025 m near the station, and the junction for the branch to Mende. After two hours of climbing from the Mediterranean plain, the train now drops towards the Allier.
- LangogneSmall town on the upper Allier, close to where the river gorges begin. Below the town the line follows the Allier northwards through the gorge for well over an hour of the video.
- ChapeaurouxTiny halt where the Chapeauroux river joins the Allier, beside the 433 m stone viaduct of the same name. A workers' camp stood here while the viaduct was being built, which gave it its other name.
- LangeacTown where the Allier gorge opens out. The Langeac–Villefort section, the last gap in the line, opened on 16 May 1870, finally joining Clermont-Ferrand and Nîmes by rail.
- Clermont-FerrandCapital of Auvergne and the end of the video. The Clermont–Issoire section, the first at the northern end, was inaugurated in 1855; today trains from Nîmes terminate here.
Riding it for real
The line is run by SNCF as part of the regional TER network; since 2018 the through service between Nîmes and Clermont-Ferrand has run under TER Occitanie (liO) with Coradia Liner trains, and shorter regional trains serve parts of the route, with timetables that vary by season. Check SNCF TER Occitanie or TER Auvergne-Rhône-Alpes for current timetables and fares before you travel.
The video is embedded from YouTube and remains on its owner’s channel. Views count toward the original video.